TORT7 Series Delay-ON Delay-OFF 10-in-1 Asymmetric Cycler Relay
- Range: 0.1s to 10 Days
- AC/DC 24V-240V Universal
- 16A SPDT AgNi Output
Export-certified modular DIN-rail time relays, asymmetric pulse cyclers, and heavy-duty smart switches configured for Moroccan panel builders, agricultural automation, and commercial distribution boards.
From Atlantic coastal humidity to high thermal fluctuations in the Drâa-Tafilalet and Atlas interior, our switching controls satisfy Morocco's stringent electrical installation frameworks.
Widely deployed across agricultural perimeters in Souss-Massa, Gharb, and Berkane. Time delay relays prevent hydraulic water hammer during borehole submersible pump startup via Star-Delta switching delays (0.1–30s). Asymmetric cyclers automate solenoid valve drip irrigation intervals according to local groundwater quotas.
Critical in Ouarzazate, Midelt, and decentralized commercial solar arrays. Programmable delay relays synchronize hybrid ATS units when shifting between ONEE national grid power, off-grid lithium energy storage, and diesel gensets. The time buffer ensures generator voltage stabilization before load acceptance.
Serving OEM Tier-1 factories in Tanger Automotive City and Atlantic Free Zone Kenitra. Multi-function timing relays (TORT7) control sequential parts conveyor indexing, robotic pneumatic cell timing, and paint shop exhaust purge delays compliant with European industrial automation protocols.
Installed across fruit and seafood packing plants in Agadir, Casablanca, and Dakhla. Timed defrost cycles eliminate evaporator coil frost build-up while compressor restart delays prevent short-cycling failures caused by transient voltage sags on regional power lines.
Crucial for Morocco's national emergency water strategy (Casablanca and Chtouka Aït Baha plants). Relays supervise chemical dosing intervals, backwash filter cycling, and high-pressure reverse osmosis booster pump stage delays under saline maritime microclimates.
Automating exterior architectural facade lighting in Rabat and Marrakech, airport terminal ventilation staging, and ONCF railway substation auxiliary circuits. Weekly 7-day digital relays minimize peak tariff energy consumption by locking out high-current chillers during peak rate brackets.
Compare core architectures to choose the proper device category for electrical distribution boards conforming to Moroccan standard NM EN 61812-1.
| Relay Series | Timing Mode & Range | Operating Voltage | Output Contacts | Key Environmental Protection | Target Moroccan Application |
|---|---|---|---|---|---|
| TORT7 10-in-1 | 0.1 sec to 10 days (Delay-ON, Interval, Asymmetric Cycler) | AC/DC 24–240V (50/60Hz) | 1x SPDT (16A / 250VAC) AgNi | IP40 Housing / IP20 Terminals, -20°C to +55°C | Industrial machinery, motor Star-Delta control panels, Kenitra industrial free zones. |
| TOS6-40 Bluetooth | 1 sec to 99 hrs, 28 memory groups, cyclical looping | AC 85–265V wide range | 40A Direct Switch (AC-1) | Transient surge suppression, internal memory retaining programs upon power loss | High-capacity agricultural pumps, solar water heating, large commercial lighting. |
| TOMZN 7-Day Digital | 1 min to 168 hrs, weekly recurring, 16 ON/OFF pairs | AC 220–240V / DC 12–24V options | 1NO + 1NC (16A inductive/capacitive) | CR2032 lithium backup battery (>3 years shelf life), anti-interference shielding | Street lighting distribution boxes, greenhouse ventilation, commercial HVAC schedules. |
| TOS7-B Heavy Breaker | Countdown, cyclical timing, instant manual App override | AC 85–265V (Single Phase) | 63A Incomer Integrator | V0 flame-retardant polyamide housing, optical isolation on control board | Full sub-distribution board scheduled disconnect, residential villa backup transfer. |
| 3P+N Delay Protector | Trip time 0.1–10s, Reconnection delay 1–500s adjustable | AC 380V (L-L), 220V (L-N) | 63A / 80A 3-Phase Direct Cut | Over-voltage (230–300V), Under-voltage (140–210V), Phase sequence lock | ONÉE rural grids protection, cold storage multi-compressor stations in Souss-Massa. |
Technical Compliance Insight: In accordance with Moroccan ONÉE guidelines and Ministry of Industry regulations (Law 24-09 on Product Safety), time relays utilized in industrial starter switchboards must maintain a dielectric isolation strength of at least 2.5 kV for 1 minute and comply with CE/IEC 60947-5-1 standards. Zhejiang TMB Electric supplies certified type-test reports with all customs shipments destined for Casablanca and Tanger Med.
Strategic investments in infrastructure, nearshoring manufacturing, and renewable power are driving significant demand for intelligent low-voltage relays.
Morocco is investing over $14 billion in drought resilience, seawater desalination, and pressurized localized irrigation. This has shifted farm irrigation away from manual gate switches toward automated cyclical pulse relays and astronomical timers that reduce water evaporation and power consumption during peak daytime tariffs.
With Morocco targeting 52% renewable power generation by 2030, hybrid installations combining rooftop solar arrays, backup diesel generators, and battery storage are booming. Automatic transfer switch delay controls and voltage reconnection delayers are mandatory to prevent micro-outages and frequency instability.
European supply chains nearshoring to Tanger Med, Kenitra, and Nouaceur require DIN-rail switchgear matching strict IEC/EN norms. Panel builders in Casablanca now demand CE-marked multi-voltage time relays (AC/DC 24-240V) that allow standardization across multinational machine designs.
Zhejiang TMB Electric Co., Ltd. integrates 24 years of manufacturing heritage in Liushi, Wenzhou with rigorous international quality verifications.
Clear answers addressing customs, Moroccan standards, technical specs, and shipping parameters.